Problem characterisation – Adur and Ouse
The Problem Characterisation stage of the DWMP uses the results from the Baseline Risk and Vulnerability Assessment (BRAVA) to explore the causes of risks and the primary drivers. A technical summary provides information on our approach to the problem characterisation.
Current risks in the Adur and Ouse Catchment
The graph below illustrates the combined results of the 2020 BRAVA assessment for all 68 wastewater systems in the Adur and Ouse river basin catchment. It shows how many wastewater systems have a risk under each of the 14 planning objectives. For example, for the risk of internal flooding, 53 wastewater systems are in band 0 (not significant), 3 are in band 1 (moderately significant), there are none in band 2 (very significant) and 12 were ‘not flagged’ for inclusion (i.e. screened out at the risk based catchment screening stage of the DWMP).
The graph illustrates that storm overflows, flooding in a 1 in 50 year storm and sewer collapse are the main concerns in this river basin based on the BRAVA results for 2020. This is illustrated by the brown bars being the highest for planning objectives 5, 4 and 3.
The wastewater systems with the highest number of planning objectives in band 2 (very significant) are Shoreham and East Worthing, each with 4 band 2 risks. Peacehaven, Goddards Green and Newhaven East have 3 planning objectives in band 2. All other catchments have fewer risks.
The specific risks and the causes of risk for each of the wastewater systems are explained in the summary of the problem characterisation for each system. These are available to download from the link next to the name of each system in the table below.
Future risks in the Adur and Ouse Catchment
The 2050 BRAVA results help us to identify the future challenges for drainage and wastewater management in the Adur and Ouse river basin catchment. These are:
(a) Growth
There are several wastewater catchments where new homes, businesses, roads and other infrastructure is planned. The main areas identified for potential new development in the Adur and Ouse catchment are:
- Brighton
- Burgess Hill
- Worthing
- Scaynes Hill
The BRAVA results show that the additional homes and businesses will increase the risks of non-compliance with our Dry Weather Flow (DWF) permits from the Environment Agency in 13 of the 68 wastewater systems, including East Worthing, Newhaven East, Shoreham, Goddards Green, Neaves Lane Ringmer, Ashington, Barcombe New and Ditchling. This means further investment will be needed in the future to increase the capacity of our treatment works to accommodate the new homes and businesses.
The additional development may mean that our current permits for wastewater treatment quality might be exceeded by 2050 without further investment in 4 wastewater systems, Balcombe, Danehill, Kingston Hollow and Staplefield.
A map of the Adur and Ouse catchment showing the estimated future growth in each wastewater system is shown below. The technical summary explains how we have considered population growth and urban creep in our DWMP.
(b) Climate change
Climate change will bring greater variability of our weather with warmer wetter winters and hotter drier summers. The impacts we will see will be more intense summer storms that exceed the capacity of the drainage and wastewater networks and cause localised flooding. Hence, the risk of flooding from sewer systems is increasing due to climate change. The technical summary explains how we have incorporated climate change into our DWMP.
We will work with partner organisations, such as East and West Sussex County Council and the Environment Agency, who have responsibility for flooding and drainage to consider options and develop opportunities to find solutions that reduce the risks from flooding.
We will need to adapt our wastewater systems to operate in future climates. There will be an increasing need to slow the flow entering our sewer networks so the systems can carry the water without flooding homes and businesses and/or without causing discharges from storm overflows. Preventing additional rainfall entering foul sewer networks, including combined sewer networks where possible, could delay the need to upgrade and enlarge the vast underground network of sewers.
Climate change is expected to have an impact on the risk of flooding in several wastewater systems, especially Brighton, East Worthing, Newhaven East, Shoreham, Henfield and Cuckfield where there is already a very significant risk from rainfall related flooding. The flooding risk will increase by 2050 in all wastewater system unless measures are taken to manage and reduce these risks. The BRAVA results for planning objective 5 indicate that the risk of storm overflow discharges for 12 wastewater systems is likely to increase to very significant by 2050.
The map below highlights the potential impact of climate change on each of our wastewater systems, and an estimate of the change in rainfall volume that the drainage and wastewater systems will need to accommodate.
The map highlights the potential impact of climate change on each of our wastewater systems. It shows the impact of climate change, urban creep and growth on the risk of flooding in a 1 in 20 year storm. We followed Water UK’s capacity assessment framework to apply a 20% uplift to rainfall forecasts to assess the potential increases in flood volumes shown on the map. Urban creep was estimated using the approach developed by the UK Water Industry Research (UKWIR) report on Urban Creep in sewerage systems (2010).
The map highlights that we will need to adapt to climate change. Adaptation will need to consider options for reducing the volume of surface water entering the sewer network in order to avoid the need for significant increases in the capacity of the existing drainage and wastewater networks.
Investment planning for each wastewater system
We used the BRAVA results and our understanding of the causes of risks and drivers to propose an investment strategy for each of the wastewater systems. Find out more information on how we determined the investment strategies. The strategies help us to target the wastewater systems that need further investment to reduce the potential risks to customers and the environment. We have produced a table that lists the proposed investment strategy for each catchment.
We used a risk based approach to identify the wastewater systems that we need to progress in this first round of DWMPs. For these systems we will develop an investment plan. Our technical summary sets out how we have selected the systems to take forward.
The table below lists the wastewater systems in the Adur and Ouse river basin catchment that we’re progressing further during this first round of the DWMPs into the investment planning stage. We have included a catchment map and an explanation of the causes of risks for these systems (see links in the table below).
The maps and causes of risks for the remaining wastewater systems in the Adur and Ouse will be published when available.
System Ref | Wastewater system | Wastewater system map | Information on causes of risks |
---|---|---|---|
BRIG | Peacehaven Brighton | Peacehaven Map | Peacehaven Causes of Risks |
BURG | Goddards Green | Goddards Green Map | Goddards Green Causes of Risks |
NEWE | Newhaven East | Newhaven Map | Newhaven Causes of Risks |
PORT | Shoreham | Shoreham Map | Shoreham Causes of Risks |
SCAY | Scaynes Hill | Scaynes Hill Map | Scaynes Hill Causes of Risks |
WOEA | East Worthing | East Worthing Map | East Worthing Causes of Risks |