Regional BRAVA risk maps
We have produced maps of our region showing the results of the BRAVA for each of the DWMP planning objectives. The maps show the area covered by each of our wastewater systems (known as the wastewater catchment), shaded with the risk band colour.
These maps helps us identify where further work is required in the next stages of the DWMPs to understand the drivers and causes of these risk, and develop options for reducing these risks.
1. BRAVA Results – Internal Sewer Flooding Risk
2. BRAVA Results – Pollution Risk
3. BRAVA Results – Sewer Collapse Risk
4. BRAVA Results – Sewer Flooding 1 in 50 year storm
5. BRAVA Results – Storm Overflow Performance
6. BRAVA Results – Risk of WTW Compliance (Quality)
7. BRAVA Results – Annualised Flood Risk (Hydraulic Overload)
8. BRAVA Results – Wastewater Treatment Works (WTW) Dry Weather Flow (DWF) Compliance
9. BRAVA Results – Achieve Good Ecological Status / Potential
10. BRAVA Results – Improve Surface Water Management
11. BRAVA Results – Secure Nutrient Neutrality
12. BRAVA Results – Reduce Groundwater Pollution